PU Roofkote-ES
Polyurethane Waterproof and Heat Reflective Coating

- Premium-grade polyurethane coating for waterproofing rooftops, building walls, roofs, and gutters
- Exceptional flexibility over 900%
- Seamless waterproofing, 100% water penetration resistance
- Heat-reflective additives help reduce building temperature
- Weather and UV resistant
- Bridges and seals cracks caused by temperature changes
- Water-based formula, easy to apply
- Low VOC, safe for users
- Easy maintenance and repair
คุณสมบัติ | ผลการทดสอบ | มาตรฐานการทดสอบ |
---|---|---|
Solid Content | 60 ± 2 % | – |
Density | 1.25 ± 0.1 | ASTM D1475 |
Viscosity | 20,000-25,000 cps | Brookfield Viscometer |
Hardness | 55-65 Shore A | ASTM D2240 |
Elongation | 800 – 900 % | ASTM D412 |
Tensile Strength | 1.45 N/mm2 | ASTM D412 |
Bond Strength | 1.40 MPa | ASTM D4541 |
Crack Bridging | 2 mm | ASTM C1305 |
Recovery | 150% pass | – |
Resistance to ponding water | 30 days | – |
Heat Reflectance | 90% | JIS R3106 |
Working Temperature | 5 °C – 35 °C | – |
Drying Time | 1-2 hours | – |
Full Cure Time | 7 days | – |
PACKING | 20 Liter / pail |
---|---|
CONSUMPTION | 0.5 – 0.7 kg/ m2 / coat |
COVERAGE | 14 m2 / pail (2 coats) |
Surface Preparation
• New concrete surfaces must be at least 7 days old before application.
• The surface must be clean, dry, free from oil, contaminants, and loose particles. Prepare the surface by high-pressure water jetting or scrubbing. If mold is present, wash the surface with sodium hypochlorite (cleaning solution) before rinsing thoroughly with clean water.
• For loose surfaces or large cracks, cut or remove the defective area and repair with non-shrink repair mortar before applying PU ROOFKOTE-ES
Primer Application
• Add 20–30% clean water and mix well to use as a primer coat.
• Allow the primer coat to dry completely before applying the waterproof coating.
Waterproof Coating Application
• Stir the material in the container thoroughly before use.
• PU ROOFKOTE-ES can be applied by spray, brush, or roller on the prepared surface. Do not apply more than 1 kg per 2 m², as this will result in a thin film and reduced waterproofing performance.
• For multiple coats, wait until the previous coat is completely dry (approximately 2 hours, depending on weather conditions) before re-coating. Apply each coat in a direction perpendicular to the previous one.
• For the final coat, 5–10% clean water may be added to achieve a smoother finish.
For additional questions
02- 569-1540, 099-165-1155, 099-492-4224
Clevcon Thailand Co., Ltd.
Clevcon (Thailand) Co., Ltd.
is the expert of chemical products for construction industry. We both manufacture and distribute a complete range of goods under the well known brand “Clevcon”.